• News
  • Join our Team
  • Contact us
logo-adelcologo-adelcologo-adelcologo-adelco
  • Home
  • About ADELCO
    • Company History
    • ADELCO Infrastructure
    • Mission, Vision, and Values
    • Policies
    • ADELCO Certifications
  • Products and Services
    • Power Conditioners
      • UPS Industrial Series
      • UPS Corporate Series
      • UPS Socomec
      • UPS Socomec Modular
      • Electronic Stabilizer
      • Inverter DC/AC
      • DC/DC converter
      • Static Switch
      • Battery Discharger
      • The BMS System to monitor the Battery
      • Battery
    • Industrial Rectifiers
      • Rectifiers/ Battery Chargers
      • Industrial Rectifiers
      • Rectifiers for Electrochemical Processes
      • Rectifiers, Industrial, for the Electro-Deposition
      • Rectifiers for Manual or Automatic Cathodic Protection
    • Transformers/Reactors
      • Transformers-Dry – Low-Voltage
      • Transformers-Dry – Medium-Voltage switchgear
      • Reator Air Core
      • Reactor Iron Core
      • Magnetic Separator Coils
    • High Voltage Equipament
      • High Voltage supplies
      • Equipment for the Testing of the Applied Voltage
      • The drive Voltage of the Type of Brush or the moving-Coil
    • Equipment
      • STATCOM
      • Active filter for Harmonics
  • Technical Assistance
  • COMPLIANCE
    • Privacidade e Proteção de Dados Pessoais
    • Code of Ethics and Conduct
    • Ethics Channel
ADELCO & Socomec partnership
15 January 2021
ADELCO & HBL partnership
20 January 2021
Categories
  • Uncategorized
Tags

Partnership ADELCO x FLUMINENSE

In 2020, ADELCO has started over in a technology partnership, this time with the Fundação Euclides da Cunha, of the Institutional Support of the FLUMINENSE Federal University, Rio de janeiro state, for the development of a prototype of a medium-voltage current-limiting, short-circuit to the power distribution system. The device is installed in series downstream of the transformer substations and power, with the aim of protecting assets, the network is subjected to over-currents during a failure in the system.

Share
31

Related Articles

20 de June de 2026

Reator Núcleo de Ar RNA: Robustez e Confiabilidade para Aplicações Industriais Críticas


Read more
13 de June de 2026

UPSmDSP: Sistema de Energia Ininterrupta em C.A. para Aplicações Industriais, Subestações e Telecomunicações


Read more
27 de May de 2026

Transformadores a Seco de Baixa Tensão TRB e TR-Ex: Versatilidade, Segurança e Confiabilidade para Diferentes Aplicações


Read more

Recent Posts

  • Reator Núcleo de Ar RNA: Robustez e Confiabilidade para Aplicações Industriais Críticas 20 de June de 2026
  • UPSmDSP: Sistema de Energia Ininterrupta em C.A. para Aplicações Industriais, Subestações e Telecomunicações 13 de June de 2026
  • Transformadores a Seco de Baixa Tensão TRB e TR-Ex: Versatilidade, Segurança e Confiabilidade para Diferentes Aplicações 27 de May de 2026
  • UPS Industrial UPSmDSP: Energia Ininterrupta para Aplicações Críticas 20 de May de 2026
  • Inversor CC/CA IEm-DSP: Confiabilidade em Corrente Alternada para Aplicações Críticas 13 de May de 2026
  • Home
  • About ADELCO
  • Products and Services
  • Technical Assistance
  • News
  • COMPLIANCE
  • Join our Team
  • Contact Us
Linkedin
© 2025 ADELCO - All rights reserved. Developed by RudekWydra
    • News
    • Join our Team
    • Contact us